On the request of the customer, we received a used crane for owerhaul. All hydraulic equipment was removed from the crane, the crane was disassembled and a detailed inspection was carried out. After the inspection, the following works were performed:

  • sandblasting and anti-corrosion protection of the crane
  • fabrication a part of the crane that is damaged by corrosion
  • adaptation to the new stand
  • repair of hydraulic cylinders with the production of new slewing cylinder housing and piston rods for tehe main jib cylinder and second jib cylinder
  • replacement of base bearings
  • replacement of all hydraulic pipes (rigid and flexible)

The crane was assembled and tested in our company’s workshop.

We must add that this was an interesting project and a pleasure when we revitalize something old and defective and put it back into use.